Claim Prevention Solutions in Gas Industry Contracts

Document Type : Applied Article

Author

Claim Manager, Oil & Design Construction Company, Tehran, Iran

Abstract

In the current sanctions situation and due to the departure of many well-known western companies from the country, the development process of the gas industry will require the participation and diligence of domestic specialists, suppliers and contractors more than before. That it is necessary to examine their obstacles and problems in similar plans and projects in the country and consider them as a lesson learned and with the aim of not reinventing the wheel in the future contracts of the country's gas industry.
One of the reasons for the stoppage or failure of many plans and projects in the country, especially in the field of oil and energy, is the unresolved or prolongation of claims raised by domestic suppliers and contractors, such as the failure to take preventive measures or the failure to resolve claims. In the short term, it has caused a delay in the fruition of the plans or their suspension and the waste of treasury resources and damage to the parties to the agreement.

In this article, while knowing the main processes of claims management, we will examine preventive solutions in this field that can be used in gas industry projects

Keywords

Main Subjects

  1. استاندارد PMBOK (ویرایش ششم) سال 2017.
  2. فرهنگ واژگان نظام فنی و اجرایی کشور - سازمان مدیریت و برنامه‌ریزی کشور 1383.
  3. شرایط عمومی پیمان‌های EPC صنعتی- سازمان برنامه و بودجه (بخشنامه شماره 114650/1402 مورخ 09/03/1402).
  4. نشریه 717 سازمان برنامه و بودجه - راهنمای انتخاب روش تدارکات پروژه سال 1395.
  5. قانون نظام فنی و اجرایی کشور مصوب 20/01/1385 هیئت وزیران.
  6. نشریه 5490 سازمان برنامه و بودجه - سال 1381.
  • Receive Date: 11 November 2023
  • Revise Date: 13 December 2023
  • Accept Date: 28 December 2023